Glossary · Regulation

Date or time range of production (EUDR)

Updated · 2026-11-19
Definition

Under Article 9(1)(d) of the EUDR, operators record, together with the geolocation of all plots of land, the date or time range of production of the relevant commodities, meaning when they were grown, harvested, obtained from or raised on those plots.

Also known as: time of production · production date · harvest date · production period

Why does it matter?

The EUDR asks for the geolocation of plots and when the commodities were produced there (Article 9(1)(d)). The date links a harvest to the state of its plot of land at that time, so that deforestation after the cut-off date of 31 December 2020 can be related to the commodities produced. It also determines whether a product falls within the Regulation’s scope in time (Article 1(2)).

How does it work in practice?

  • What “produced” means. Grown, harvested, obtained from or raised on relevant plots of land or, for cattle, on establishments (Article 2(14)).
  • Date or range. A single date or a time range, such as a harvest season, is accepted.
  • Per plot. The date or range goes with the geolocation of the plots, as part of the information requirements kept for five years.
  • At the first mile. The most reliable source is the record made when the farmer delivers: which plot, which crop, which date. That is where first-mile traceability starts.

Common pitfalls

  • Using the shipment or invoice date. The requirement is about production, not trade.
  • One range for a whole region. A range should still be tied to the plots that supplied the lot.
  • No link between delivery and plot. Without it, the production date cannot be shown for the plots declared.

Farmer1st records deliveries with plot and date at the first mile through its traceability and certification service. See the EUDR guide for the full information requirements.

Frequently asked questions

Is a date range acceptable, or does it have to be a single date?

Article 9(1)(d) accepts either a date or a time range of production.

Why does the production date matter for scope?

Except as provided in Article 37(3), the Regulation does not apply to relevant products produced before the date indicated in Article 38(1) (Article 1(2)). The production date shows which side of that line a product falls.

Sources

Tell us about your supply chain.

Ten minutes with our scoping assistant. We come back with a first sketch of your service.